25 October 2019

SW College Erne Project ‘Topping Out’ Ceremony

Tracey Brothers hosted the ”topping out” ceremony at the SW College Erne Project to mark a key milestone in the construction of this state-of-the-art Campus. The Erne Campus will be a flagship for sustainable construction with its pioneering PassivHaus premium standard and modern design and construction and is pushing the boundaries of technology in almost

24 October 2019

SW College & Tracey Brothers launch new Erne Academy

South West College and Tracey Brothers have collaborated to create a new learning opportunity with the focus on Learning through Innovation. The new campus which will be the first educational building worldwide to achieve the highest international standard in environmental construction – PassivHaus Premium and BREEAM Excellent, will give it’s students the opportunity to study

15 October 2019

Lanyon Tower (West) Handed Over to Client

We have completed the Fit-Out of the West Tower at Lanyon Place, Belfast for Oxford Street Capital Ltd. Our works comprised shell and core works including CAT A Fit-Out to Levels 6 – 7 and CAT B Fit-Out to levels 5, 8 – 11 along with associated M&E installations.

9 July 2019

SW College Erne Project Progressing

Works are progressing well 10 months into the Erne Project for South West College with the structural frame in place and roof complete the building envelope is well advanced and scaffold starting to come down. Internal fit out has commenced with site services and site structures progressing. All the while, the challenges presented by the

13 March 2019

South West College Erne Project Passive House Workshop

We held a very successful Passive House workshop / training session at our SWC Erne Campus site. The workshop focused on airtightness, which is probably the most critical matter in achieving a Passive House Project. The new SWC Erne Campus, will see the delivery of the FIRST educational building WORLDWIDE to achieve the highest international

13 March 2019

St. Patrick’s Academy Dungannon – Official School Opening

Following its completion in November 2018 the new St. Patrick’s Academy was officially opened by President Michael D Higgins on the 7th of March 2019. The occasion marked the culmination of decades of planning for the school and Tracey Brothers are delighted to have delivered the new state-of-the-art facilities.

24 October 2018

Construction Excellence Awards 2018 – Winner

Having been short listed as a Finalist, we are now the proud recipient of the General Construction Award – Restoration Category, for HMS Caroline, Historic Buildings and landscaping. We were delighted to receive the award at the Awards Gala Evening hosted by the Construction Employers Federation (CEF) in partnership with Specify magazine, held in the

15 October 2018

Official ‘Cutting of the Sod’ at Holy Family School, Cootehill

The first sod has been cut on the site of the new Holy Family School, Cootehill, Co. Cavan, by Taoiseach Leo Varadkar. The Development will consist of a new 1-2 storey replacement Special need’s School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play

15 October 2018

Elasto-Metall Ireland Ltd Factory & Office Extensions Completed

Works were recently completed on the Elasto-Metall Ireland Ltd site in Manorhamilton for the construction of two new extensions to their existing office and factory areas. A new 900m² portal frame factory extension was completed along with a new two storey 350m² office block extension. This was the 3rd phase of works completed by Tracey

24 September 2018

Cyber Essentials Certification

Tracey Brothers has been assessed against Cyber Essentials Scheme Test Specification and have been awarded Level of Certification: Cyber Essentials. The scope of assessment of our Internet facing infrastructure includes firewalls, routers, end user devices ad hosted systems located within the UK.

12 September 2018

Construction Excellence Awards 2018 – Finalist

Tracey Brothers Ltd have been short listed as Finalists in this year’s awards in both the Infrastructure – Training Award Category and the General Construction Award – Restoration Category, for HMS Caroline, Historic Buildings and landscaping. Following further deliberation, the distinguished judging panel will choose a winner from each shortlist and their decision will be

20 April 2018

HMS Caroline Historic Buildings & Hard Landscaping Works Complete

The restoration of the historic Pump House building and scheduled monuments at Alexandra Dock is now complete. The finished building is now home to the HMS Caroline Visitor Reception & Tickets area along with dedicated Exhibition space featuring much of the original Edwardian-era machinery and associated technology. Visitors to HMS Caroline can now gain access