We held a very successful Passive House workshop / training session at our SWC Erne Campus site. The workshop focused on airtightness, which is probably the most critical matter in achieving a Passive House Project. The new SWC Erne Campus, will see the delivery of the FIRST educational building WORLDWIDE to achieve the highest international standard in environmental construction – PASSIVHAUS PREMIUM

More News

9 July 2019

SW College Erne Project Progressing

Works are progressing well 10 months into the Erne Project for South West College with the structural frame in place and roof complete the building envelope is well advanced and scaffold starting to come down. Internal fit out has commenced with site services and site structures progressing. All the while, the challenges presented by the

20 March 2017

HMS Caroline Historic Buildings & Hard Landscaping Works

This project which is currently on-site consists of the restoration of the historic Thompson Pump House building and scheduled monuments. The finished building will be home to the HMS Caroline Visitor Reception & Tickets area along with dedicated Exhibition space. External works on the Thompson Pump House include demolitions; repair, replacements & repointing of brickwork;

10 December 2017

PassivHaus Staff Training

As part of our programme of Continuing Professional Development a number of our staff have recently obtained PassivHaus Tradesperson Certification for PassivHaus Basics along with Building Envelope Specialisation. The qualification was obtained in accordance with the examination regulations from 1st April 2012 and awarded upon successful completion of the Certified PassivHaus Tradesperson examination. Additional staff

23 April 2026

IDA Mullingar Student Visit

As works continues to progress at pace we were delighted to Welcome @Darren ODonoghue and @Mark Grincell and all the Year 2 and 3 students studying BSc in Architectural Technology at the South East Technological University to our new Advance Building Solution project for IDA Ireland at the IDA Ardmore Business & Technology Park , Mullingar

28 October 2016

Final Building of the ‘Concourse Development’ Complete

Works have been completed on the final building of the ‘Concourse’ development. Constructed to a high specification, including a web enabled building management system and incorporating a number of energy efficiency measures, the building provides the Belfast Campus with a further 55,000 sq.ft of net lettable space over five storeys including wet lab facilities alongside technology

24 September 2018

Cyber Essentials Certification

Tracey Brothers has been assessed against Cyber Essentials Scheme Test Specification and have been awarded Level of Certification: Cyber Essentials. The scope of assessment of our Internet facing infrastructure includes firewalls, routers, end user devices ad hosted systems located within the UK.