Description

This 8,640m² Compressor Manufacturing Facility was constructed on specialist vibroflotation foundations along with in-situ reinforced concrete ground beams, pad and strip foundations. The reinforced in-situ concrete ground floor slab was designed to include for drains, sumps and plinths and was sealed with trowelled in Bentonac.

Floor pits, services ducts, machine bases etc. were all fully co-ordinated to suit the Client’s Generator Manufacturing plant production lines and processes. We worked closely with the Client and their specialist production line plant & equipment suppliers.

Extensive siteworks, drainage and effluent plant installations were completed.