This project which is currently on-site consists of the restoration of the historic Thompson Pump House building and scheduled monuments. The finished building will be home to the HMS Caroline Visitor Reception & Tickets area along with dedicated Exhibition space.

External works on the Thompson Pump House include demolitions; repair, replacements & repointing of brickwork; new carved keystone with ‘BHC’ logo; roof repairs & re-slating; window repairs and replacements; render repairs etc.

Internal works include strip-outs; dry-lining; construction of new ramps between spaces; stud wall construction; installation of toilet cubicles & vanity units; M&E Installations; cleaning & re-pointing of exposed brick surfaces; plasterwork & painting etc.

The works to the historic Alexandra Dock include infrastructure and services works, lifting & relaying of historic Galleted & Belfast cobbles/setts, new natural stone paving, setts & kerbs, construction of a new bridge link across the dock and construction of two brows onto the HMS Caroline.

More News

1 April 2025

CEF Gala Dinner

Tracey Brothers LTD were delighted to attend the CEF Gala Dinner, marking 80 years of Northern Ireland’s Construction Industry!  Hosted by Pamela Ballentine in the Titanic Building Belfast, the night encapsulated the growth of the Construction sector over the last 8 decades, recognised the present, and looked ahead to a bright future for this Industry.

25 February 2026

Tracey Brothers Ltd is ISO 19650 Certified

We are thrilled to announce that Tracey Brothers Ltd has achieved ISO 19650 certification – a significant step in demonstrating our commitment to excellence in BIM and information management across all our projects. A special thanks to our BIM Manager, Jeevan Prakash Mohan, whose dedication, expertise, and leadership made this achievement possible. Your hard work ensures that Tracey

20 June 2021

Restoration of The Grand Opera House Belfast completed

The restoration and development of the Grand Opera House in Belfast has been completed. On Thursday 10th of June2021 the results of the restoration project were unveiled prior to its planned re-opening in July 2021. The works included painstaking restoration and conservation of the many ornate features of the auditorium along with redesign of the

13 March 2019

South West College Erne Project Passive House Workshop

We held a very successful Passive House workshop / training session at our SWC Erne Campus site. The workshop focused on airtightness, which is probably the most critical matter in achieving a Passive House Project. The new SWC Erne Campus, will see the delivery of the FIRST educational building WORLDWIDE to achieve the highest international

5 September 2025

IDA Advance Building Solution Cavan

Another successful handover for IDA Ireland with the recent completion of IDA Advance Building Solution in Cavan. Tracey Brothers have handed over the new Advanced Building Solution at IDA Cavan Business & Technology Park for IDA Ireland. The Advanced Building Solution spans approximately 3,000m² of production space along two-storey office accommodation with Category A level

24 October 2019

SW College & Tracey Brothers launch new Erne Academy

South West College and Tracey Brothers have collaborated to create a new learning opportunity with the focus on Learning through Innovation. The new campus which will be the first educational building worldwide to achieve the highest international standard in environmental construction – PassivHaus Premium and BREEAM Excellent, will give it’s students the opportunity to study