The recently completed South West College Erne Campus, designed & built by Tracey Brothers Ltd., has been certified by the Passive House Institute.

The Erne Campus is the largest New Build Passive House Premium Building in the world and also the largest Passive House Premium Educational Building in the world. It is also the first building in the UK to achieve both Passive House Premium and BREEAM Outstanding accreditations.

The official plaque was presented to Tracey Brothers and the College by Tomas O’Leary of MosArt Architects on the 4th of June 2021.

More News

28 September 2016

St. Patrick’s Academy, Dungannon

August 2016 saw the commencement of works for the construction of the new c. 15,000m² school building for St. Patrick’s Academy on the Killymeal Road, Dungannon . The new school will be constructed on a Campus shared with St. Patricks College. Upon completion of the new school building, works will commence for the construction of

20 June 2021

Restoration of The Grand Opera House Belfast completed

The restoration and development of the Grand Opera House in Belfast has been completed. On Thursday 10th of June2021 the results of the restoration project were unveiled prior to its planned re-opening in July 2021. The works included painstaking restoration and conservation of the many ornate features of the auditorium along with redesign of the

13 March 2019

South West College Erne Project Passive House Workshop

We held a very successful Passive House workshop / training session at our SWC Erne Campus site. The workshop focused on airtightness, which is probably the most critical matter in achieving a Passive House Project. The new SWC Erne Campus, will see the delivery of the FIRST educational building WORLDWIDE to achieve the highest international

15 October 2018

Elasto-Metall Ireland Ltd Factory & Office Extensions Completed

Works were recently completed on the Elasto-Metall Ireland Ltd site in Manorhamilton for the construction of two new extensions to their existing office and factory areas. A new 900m² portal frame factory extension was completed along with a new two storey 350m² office block extension. This was the 3rd phase of works completed by Tracey

9 July 2019

SW College Erne Project Progressing

Works are progressing well 10 months into the Erne Project for South West College with the structural frame in place and roof complete the building envelope is well advanced and scaffold starting to come down. Internal fit out has commenced with site services and site structures progressing. All the while, the challenges presented by the

15 October 2018

Official ‘Cutting of the Sod’ at Holy Family School, Cootehill

The first sod has been cut on the site of the new Holy Family School, Cootehill, Co. Cavan, by Taoiseach Leo Varadkar. The Development will consist of a new 1-2 storey replacement Special need’s School building with 26 classrooms and associated ancillary accommodation with 94no. car parking spaces, bus drop-off, 1 no. sports pitch, play