South West College and Tracey Brothers have collaborated to create a new learning opportunity with the focus on Learning through Innovation.

The new campus which will be the first educational building worldwide to achieve the highest international standard in environmental construction – PassivHaus Premium and BREEAM Excellent, will give it’s students the opportunity to study in a ‘living learning laboratory.

Tracey Brothers look forward to working with SWC on the Erne Academy to provide long-term benefits to both the academic and construction communities in technology, innovation & sustainability.

More News

6 March 2017

Works On-Going at Dunnes Stores Abbeycentre

The works include the construction of 3Nr extensions to and the provision of new roof coverings to the existing Dunnes Stores at Abbeycentre Shopping Centre. Extension 1 is a new front double height retail extension together with a new public front entrance arrangement. Extension 2 is a new service yard double height storage and office

26 January 2026

Dean’s List Award for our Quantity Surveyor Ryan

Ulster University’s Dean’s List awards recognize top-performing students for outstanding academic excellence and high achievement within their respective faculties. These awards are based on merit for students who consistently attain top marks. This years awards were presented at an event hosted by the University of Ulster on Friday the 23rd of January. Congratulations to our

25 October 2019

SW College Erne Project ‘Topping Out’ Ceremony

Tracey Brothers hosted the ”topping out” ceremony at the SW College Erne Project to mark a key milestone in the construction of this state-of-the-art Campus. The Erne Campus will be a flagship for sustainable construction with its pioneering PassivHaus premium standard and modern design and construction and is pushing the boundaries of technology in almost

9 July 2019

SW College Erne Project Progressing

Works are progressing well 10 months into the Erne Project for South West College with the structural frame in place and roof complete the building envelope is well advanced and scaffold starting to come down. Internal fit out has commenced with site services and site structures progressing. All the while, the challenges presented by the

31 August 2017

Works complete at Cleaver House

Works were recently completed 0n the Cleaver House Building, Belfast where we carried out the strip out and refurbishment of the building to provided fully fitted out Grade A office accommodation on the second, third, fourth & fifth floors. Works also included ground floor structural alterations, installation of new mechanical, electrical & sprinkler services and

7 June 2017

Handover of Dunnes Stores at Abbey Centre

Following up on the previous successful completion of the extension for the new NEXT store at Abbey Centre Tracey Brothers have completed and handed-over the newly extended Dunnes Stores Unit to our client New River Retail. The construction of 3Nr extensions has added 12,100sqft of mixed retail space to the existing unit. Roofing upgrade works