Works 0n the Cleaver House Building, Belfast are on-going and consist of refurbishment & office accommodation fit-out of the second, third, fourth & fifth floors, ground floor structural alterations, full strip-out of and installation of new mechanical, electrical & sprinkler services and installation of a roof top external plant room. Ground and first floor accommodation remains occupied.

Refurbishment works include removing existing finishes, stud wall partitions, ceiling finishes, wall finishes, floor finishes and existing raised access floors and replacing with new, new finishes to the main accommodation stair and a new glazed shop front and glazed entrance doors.

The Listed Building is situated on a confined site in close proximity to Belfast City Hall, adjacent to commercial properties, city centre bus lanes & main arterial routes, all of which impose restrictions on site operations, noise, deliveries and storage.

More News

24 September 2025

IDA Advance Building Solution Mullingar

The sod cutting ceremony took place recently at the new Advance Building Solution for IDA Ireland in Mullingar and Tracey Brothers were delighted to host the Minister for Enterprise Tourism & Employment, Peter Burke TD along with Mary Buckley, Executive Director of IDA Ireland and IDA Ireland’s management team including Sarah O’Connell, Head of Strategic

1 June 2025

Sligo University Medical Beds

Tracey Brothers are proud to announce their appointment as the Main Contractor for the new Medical Beds Block at Sligo University Hospital. The works will involve the construction of two new 21-bed inpatient wards, designed to integrate seamlessly with the existing live hospital environment. This project forms part of the continued expansion and modernisation of

15 October 2018

Elasto-Metall Ireland Ltd Factory & Office Extensions Completed

Works were recently completed on the Elasto-Metall Ireland Ltd site in Manorhamilton for the construction of two new extensions to their existing office and factory areas. A new 900m² portal frame factory extension was completed along with a new two storey 350m² office block extension. This was the 3rd phase of works completed by Tracey

24 September 2018

Cyber Essentials Certification

Tracey Brothers has been assessed against Cyber Essentials Scheme Test Specification and have been awarded Level of Certification: Cyber Essentials. The scope of assessment of our Internet facing infrastructure includes firewalls, routers, end user devices ad hosted systems located within the UK.

26 January 2026

Dean’s List Award for our Quantity Surveyor Ryan

Ulster University’s Dean’s List awards recognize top-performing students for outstanding academic excellence and high achievement within their respective faculties. These awards are based on merit for students who consistently attain top marks. This years awards were presented at an event hosted by the University of Ulster on Friday the 23rd of January. Congratulations to our

20 June 2021

Restoration of The Grand Opera House Belfast completed

The restoration and development of the Grand Opera House in Belfast has been completed. On Thursday 10th of June2021 the results of the restoration project were unveiled prior to its planned re-opening in July 2021. The works included painstaking restoration and conservation of the many ornate features of the auditorium along with redesign of the