This project which is currently on-site consists of the restoration of the historic Thompson Pump House building and scheduled monuments. The finished building will be home to the HMS Caroline Visitor Reception & Tickets area along with dedicated Exhibition space.

External works on the Thompson Pump House include demolitions; repair, replacements & repointing of brickwork; new carved keystone with ‘BHC’ logo; roof repairs & re-slating; window repairs and replacements; render repairs etc.

Internal works include strip-outs; dry-lining; construction of new ramps between spaces; stud wall construction; installation of toilet cubicles & vanity units; M&E Installations; cleaning & re-pointing of exposed brick surfaces; plasterwork & painting etc.

The works to the historic Alexandra Dock include infrastructure and services works, lifting & relaying of historic Galleted & Belfast cobbles/setts, new natural stone paving, setts & kerbs, construction of a new bridge link across the dock and construction of two brows onto the HMS Caroline.

More News

1 June 2025

Sligo University Medical Beds

Tracey Brothers are proud to announce their appointment as the Main Contractor for the new Medical Beds Block at Sligo University Hospital. The works will involve the construction of two new 21-bed inpatient wards, designed to integrate seamlessly with the existing live hospital environment. This project forms part of the continued expansion and modernisation of

7 June 2017

Handover of Dunnes Stores at Abbey Centre

Following up on the previous successful completion of the extension for the new NEXT store at Abbey Centre Tracey Brothers have completed and handed-over the newly extended Dunnes Stores Unit to our client New River Retail. The construction of 3Nr extensions has added 12,100sqft of mixed retail space to the existing unit. Roofing upgrade works

20 June 2021

Restoration of The Grand Opera House Belfast completed

The restoration and development of the Grand Opera House in Belfast has been completed. On Thursday 10th of June2021 the results of the restoration project were unveiled prior to its planned re-opening in July 2021. The works included painstaking restoration and conservation of the many ornate features of the auditorium along with redesign of the

1 October 2024

Project Completion at Sprucefield Retail Centre

Tracey Brothers are pleased to announce the successful completion of construction works to three new retail units at Sprucefield Retail Centre, delivered on programme and to a high specification. The project included full fit-out and shell works for new Nando’s, Starbucks, and Slim Chickens restaurants. In addition to the unit construction, the works also involved

24 October 2018

Construction Excellence Awards 2018 – Winner

Having been short listed as a Finalist, we are now the proud recipient of the General Construction Award – Restoration Category, for HMS Caroline, Historic Buildings and landscaping. We were delighted to receive the award at the Awards Gala Evening hosted by the Construction Employers Federation (CEF) in partnership with Specify magazine, held in the

24 September 2018

Cyber Essentials Certification

Tracey Brothers has been assessed against Cyber Essentials Scheme Test Specification and have been awarded Level of Certification: Cyber Essentials. The scope of assessment of our Internet facing infrastructure includes firewalls, routers, end user devices ad hosted systems located within the UK.